Foundation settlement remedied by steel pipe pile driving! Retaining wall and uneven ground repair work.

Eliminate the settlement of retaining wall backfill and cut-and-fill boundary strip foundations. An innovative technology that achieves high durability by pressing steel pipe piles into a hard layer using the building's own weight.

In uneven ground where backfill and cut-and-fill soil mix behind retaining walls, differential settlement of shallow foundations due to consolidation settlement and lateral flow occurs frequently. This differential settlement can cause cracks in the foundation and ground fissures, threatening the structural safety of the building. Our settlement correction work utilizes the weight of the building as jack reaction force to directly drive steel pipe piles into stable supporting ground. After precisely leveling the foundation on the settlement side with hydraulic jacks, we inject high-resin repair materials into the cracks and fill underground voids with lightweight self-hardening air milk. Construction can be carried out while residents are living in the building, reducing noise and vibration, and completing reinforcement safely and securely without the need for temporary housing. We will propose the optimal construction plan tailored to your needs.

  • others
  • Uniform ground response repair work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration